Home News Nigeria to limit electricity sales to Niger, Togo and others for six months
News

Nigeria to limit electricity sales to Niger, Togo and others for six months

337
An Electricity Grid

In a bid to increase its domestic power supply, the Nigerian government has enacted measures aimed at reducing cross-border electricity sales to neighbouring nations, particularly the Niger Republic and Togo.

The Nigerian Electricity Regulatory Commission (NERC) issued a directive, effective May 1, 2024, limiting neighbouring countries’ power supply to a maximum of six per cent of the total grid electricity.

This directive, outlined in a document titled ‘Interim Order on Transmission System Dispatch Operations, Cross-border Supply, and Related Matters,’ will remain in effect for six months, pending potential revisions.

The move, jointly signed by NERC’s Chairman, Sanusi Garba, and Vice Chairman, Musiliu Oseni, comes amidst concerns over sub-optimal grid dispatch practices impacting the ability of Distribution Companies (DisCos) to fulfil their service tariff commitments to domestic end-users.

NERC emphasised the need to address inefficiencies in the current system, stating, “The reliance on limiting Discos’ load off-take while prioritising international off-takers and eligible customers has proven neither efficient nor equitable.”

Furthermore, the regulatory body highlighted shortcomings in international and bilateral contracts with Generation Companies (GenCos), citing instances where off-takers exceed their contracted levels during peak operations without penalties.

As an interim measure, NERC’s directive aims to guide the Transmission Company of Nigeria (TCN) and the System Operator (SO) in implementing standard operating procedures to enhance transparency and fairness in grid operations.

The order mandated that the system operator supply international customers with cap capacities for six months, with a maximum load allocation of six per cent of the total available grid generation in each trading hour.

Additionally, the system operator is tasked with developing a pro-rata load-shedding scheme to ensure equitable adjustment to load allocation among all off-takers.

Furthermore, NERC has called for the installation of integrated Internet of Things (IoT) meters at all off-take and delivery points to provide real-time visibility of aggregate off-take by grid customers. This initiative is expected to be completed within three months of the order’s issuance.

In a bid to maintain regulatory oversight, the commission has ceased to recognise any capacity addition in bilateral transactions between generators and off-takers without its express approval.

“The system operator shall henceforth cease to recognise any capacity addition in bilateral transactions between a generator and an off-taker without the express approval of the commission,” it added.

“The system operator and TCN to immediately initiate and install integrated IoT metres at all off-take and delivery points of eligible customers, bilateral supplies, cross-border trades, and outgoing 33kV feeders of the Discos to provide real-time visibility of aggregate off-take by grid customers. “The installation of and streaming of data from the IOT metres should be completed within three months from the date of this order,” the statement reads in part.

Read: Tuggar to Represent Tinubu at US-Africa Summit As Shettima Backs Out Over ‘Aircraft Faults’

About The Author

Related Articles

BusinessNews

French Firm Orano Pursues Legal Action Against Niger Over Revoked Mining Licence

French nuclear fuel company Orano has launched international arbitration against Niger following...

Former Anambra governor and Labour Party presidential candidate, Peter Obi, has condemned recent calls for the Federal Government to purchase a new aircraft for the Vice President, calling the suggestion "insensitive and detached from the country's harsh economic realities."
News

Recent Stampedes at Palliative Venues Reflects Systemic Failures in Our Society – Obi

Former Governor of Anambra State and Labour Party presidential candidate in the...

Port Harcourt Refinery
News

Port Harcourt Refinery Shuts Down Less Than a Month After Resumption, Despite $1.5 Billion Rehabilitation Claims

The Port Harcourt Refinery has ceased operations for the second time in...